000 01421nam a2200253Ia 4500
008 170101s1999 xx 000 0 und d
020 _a2884320210
082 _a343.07862 FID
100 _aInternational Federation of Consulting Engineers (FIDIC)
245 0 _aConditions of contract for EPC Turnkey projects: general conditions; guidance for the preparation of particular conditions; forms of letter of tender, contract agreement and dispute adjudication agreement
250 _a1st ed.
260 _aGeneva
_bInternational Federation of Consulting Engineers (FIDIC)
_c1999
300 _a130p.
_c30 cm
500 _aSuggested by Prof. Diptiranjan Mahapatra
505 _aPart II Guidance for the preparation of particular conditions; Lecture 4: the aftermath of the crisis.; Federal Reserve banks; Global Financial Crisis, 2008-2009.
520 _aConditions of Contract for EPC Turnkey Projects, which are recommended where one entity takes total responsibility for the design and execution of an engineering project. Under the usual arrangements for this type of contract, the entity carries out all t
650 _aConstruction contracts
650 _aConstruction contracts -- Forms
650 _aEngineering contracts
650 _aEngineering contracts -- Forms
650 _aInternational Federation of Consulting Engineers (FIDIC)
650 _aStandardized terms of contract
942 _2ddc
_cBK
999 _c1977
_d1977